Quint 91 responded on mutual aid to Bellmawr for a working dwelling fire. Quint 91 arrived with first due Squirt 32 from Bellmawr Fire Rescue. Members of Quint 91 split up to cover the fire ground. Inside team members conducted a primary search and assisted the attack team with advancing on the fire. Outside team members performed horizontal ventilation opposite the fire attack, forced entry to the attached garage, and cut two ventilation holes in the roof. The fire was quickly brought under control with a 2 1/2" attack line and finished off with 1 3/4" attack lines. There were no injuries on the fire ground.Photos Courtesy Corky Pawling
Saturday, March 22, 2008
Subscribe to:
Posts (Atom)